plastemartjobs.com
Email: jobs@plastemart.com, hr@plastemart.com
Download Date: 5/12/2025 3:47:19 AM
________________________________________________________________________________________
RefNo: CA - 2482
Gender: Male
Age: 54
Highest Education Level: Post Graduate Diploma
Education Details:
Post Graduate Diploma in Plastic Processing and Technology from CIPET. 1991-1992 - Grade B
B.Sc. Non Medical from Guru Nanak Dev University 1988-1991.(Qualified with 55)
10+2 Non Medical from Punjab School Education Board 1986-1988. (Qualified with 69)
Work Experience: 31.6
Work Experience Details:
1.Presently Working as a Assistant Manager (Moulding & Utility Dept.) in Gurgaon from Dec.2003- to till date.
Previous Jobs:
1.Assistant Manager (Moulding) with Luxor Writing Instruments Pvt. Ltd. (LWIPL), Gurgaon Plant Oct.1999-to-Dec.2003.
2.Sr.Process Engineer with LWIPL # 5,Okhla Ind.Phase-3 Plant from 1995-99.
3.Process Engineer with LWIPL # 5,Okhla Ind.Phase-3 Plant from 1993-95.
4.Engineer with Suraj Plastics Pvt. Ltd. from 1992-93.
Job Responsibilities Include:
. Managing the complete moulding shop floor with 13 moulding machines ranging From 80 to 180 tonnage.
. Managing Utility department having DG Set of 320 kva-2no?s, Compressor ELGI Of capacity 120 and 150 CFM.
. Managing maintenance/repairing/development of 41 moulds ( muticavities)
. Leading, motivating and developing a workforce of 65 workers and 3 shift engineers to deliver at their utmost potential.
. Managing all resources efficiently-manpower, machines, process control to meet Production targets. (Maintain production efficiency of 94%)
. Ensure compliance of self-inspection system in order to achieve/maintain zero Defect quality standard.
. Maintain spoilage within budgeted norms as defined in SDC.
. Ensure continuos running of multi cavity moulds by motivating and developing workforce. (Maintain 99% efficiency of moulds)
. Responsible for preventive maintenance schedule (moulds & machines) as well as breakdown maintenance.
. Rationalize manufacturing operations to achieve cost reduction.
. Ensure 100% compliance on EHS measure.
. Ensuring implementation of TQM programs like quality circles, 5S Task Forces, Suggestion scheme. (Facilitator of moulding quality circle)
Machine Used:SP series Klockner & Windsor make machines of capacity 80 to 180 Tonnages.
DGP & Winmicro series Klockner & Windsor make machines of capacity 75 to 125 Tonnages.
Kirloskar Cummins DG set of 320 KVA.
Compressor ELGI makes 120 and 150 CFM.
Material Run:PP, HDPE, LDPE, HIPS, SAN, TURLEX, GPPS, ABS, ABS (Electroplating grade),DERLIN, EVA, CELULOSE ACETATE
Future Goals:
. Capacity Enhancement of moulding shop: Have increased capacity of moulding shop floor from 7 machines to 13 machines without a single day production loss.
________________________________________________________________________________________