plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 6/1/2025 5:39:39 PM ________________________________________________________________________________________ RefNo: CA - 16110 Gender: Male Age: 38 Designation: Engineer Highest Education Level: Graduate - Degree Current Gross Salary: 180000 180000 /Annum Expected Gross Salary: 300000 300000 /Annum Notice Period: 15 Days Education Details: B.E. (Electrical & Electronics) from?Vikrant Institute of Technology and?Management in?(2010-2013) with?68.16% aggregate. Diploma in Electrical Engineering from?Parul Institute of Engineering &?Technology in?(2005-2009) with?57.80%. S.S.C from Gujarat Secondary Board with 55.00%. Skill Sets: Professional Profile: An Electrical & Electronics Engineering Graduate / Diploma with over 4 years of an experience in the areas of Commissioning, engineering Service and Maintenance & Operation in Switch Yard, Power Plant, Cement Plant, and Fertilizer. Good experience in Preventive Maintenance, Breakdown Maintenance & emergency maintenance of Electrical systems, ACBs & VCBs Transformers, utility & etc. A keen planner and strategist skills in troubleshooting, team building capability and proven abilities in planning and managing resources. Work Experience: 14.1 Work Experience Details: Electrical Engineer Since Nov-2014 Company Profile:?Leading manufacturer of poultry equipments, farming, etc Job Profile: Preventive Maintenance of all kind of electrical systems like motors,?Generator, Compressor, Lighting System, etc., Maintenance of Hydraulic?system as well as Pneumatic System, BOM of Electrical Panels, Electrical?Drawing, etc. As an Electrical Engineer I have Completed Preventive maintenance of?Mesh & Door Welding Machine, Hydraulic Rolling Machine and Air Compressor. Here I learnt making drawing on Autocad. Electrical Maintenance Executive June 2013 to August 2014 Company Profile: L&T Service Centre Job Profile: Maintenance of ACBs and VCBs in L&T, Ultratech, GSFC, SMC etc. Replacing, Commissioning and Maintenance of LT & HT Panels in SMC,?GETCO, IOCL and Digvijay Cement etc. As a maintenance engineer I have completed Breakdown and preventive?maintenance of ACBs & VCBs in many companies, and test them also. Junior Engineer April 2008 to Sep 2010 Company Name:?Vasudev Power Pvt Ltd Job Profile: Commissioning of Cable laying Projects in DGVCL, Torrent Power Ltd.& etc. Operation & Maintenance of 220KV Transmission Sub-Stations at?Kakrapar nuclear power plant. As a site engineer, I handled all the technician and labor. I worked on?Yokogava as well as other equipment. I observed that if you worked?honestly than everyone trust on you. Training Undergone: Organization: Gujarat State Electricity Corporation Ltd., Utran (Gas Based Power Plant) Key Learning: Here I saw how to generate power and at which level, it send to power Grid. Which kind of protective systems are used in power plant, here I learnt about Switch Yard, Transformer, Cooling System, etc. Project Undertaken: At Diploma Level Title: ?Invisible Broken Wire Detector? as a Minor Project. Description: It appears almost impossible to detect a broken wire and the point of break without physically disturbing all the wires that are concealed in a PVC jack. Title: ?Automatic Three Phase Changer? as a Major Project. Tool Used: 240V/12V Transformer, 12V Relay, IC 747, Fuses Description: In three-phase applications, I flow voltage is available in any one or two phases,and you want your equipment to work on normal voltage, this circuit will solve?your problem. Title: Maintenance of Three Phase Induction Motors as a Maintenance Report. At Degree Level Title: ?Frequency Counter? as a Minor Project. Tool Used: IC NE555, CD4033, 7805, Bridge rectifier, LTS543 Com Cathode Display,?230V/ 9V Transformer.? Description: Most frequency counters work by using a counter that accumulates the number?of events occurring within a specific period of time. After the preset time period,?the value in the counter is transferred to a display and the counter is reset to zero. Title: ? Automatic Opening and closing of dam gates through PLC?as a Major Project. Tool Used: PLC, Motor, Water level indicator & 12v power supply. Description: The main objective of this project is to develop a PLC based system, which will Detect the level of water and estimate the water in flow rate in a dam and thereby control the movement of the gates automatically. Certifications: Participated in Welcome committee in Quarth II (College Annual Function). Participated in all four states of ?Advanced Vocational Training System? From ITI, Surat. Certificate of competency (i.e. Permit for electrical Supervisor) issued by Government of Gujarat. Future Goals: To become member of the core team, where I can contribute my domain knowledge, Analytical skills and progressive attitude towards consistent growth of the organization ________________________________________________________________________________________