plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 5/3/2025 12:21:24 AM ________________________________________________________________________________________ RefNo: CA - 15345 Gender: Male Age: 44 Designation: Senior Engineer Highest Education Level: Graduate - Degree Current Gross Salary: 550000 550000 /Annum Expected Gross Salary: 700000 700000 /Annum Notice Period: 30 Days Education Details: B.E. (Production) from K. J. Somaiya College of Engineering, Mumbai in 2004 with 60.58% HSC from B.E.S. Jr.College, Mumbai in 1999 with 55% SSC from Ahilya Vidyalaya, Mumbai in 1997 with 69.86% Skill Sets: Production Planning Execution Technical Qualification: MS.Net, C & C++-programming, MS Office. Work Experience: 20 Work Experience Details: Sr. Engineer, Since Jan 2013 Project Engineer : 2012 to 2013. Company Profile: Reputed engineering firm Job Profile: Monitoring ? Fabrication Work at Onshore & offshore activities. Involved in Piping, Structural, and Fabrication at Onshore & installation at Offshore for all the above projets. Also involved in referring Hook up, Equipment GA, Other Departments drawings i.e. Structural Drawings, Equipment Fabrication Drawings, for execution and planning work. Involved in monitoring of the Structural Fabrication of Conductor Protector Clamps, Conductor Guides, and Deck Extensions. Involved in installation of Conductor Protector Clamps, Conductor Guides, and Deck Extensions & Interconnection Hookup Piping. Preparation of Daily Progress Report, Monitoring the progress, & Project Co-ordination. Monorail Structural Fabrication up to 500 MT and its installation at Site. Rreferring Structural Drawings, Fabrication Drawings, & Assembly Drawings for Planning and Execution. Monitoring of the Structural Fabrication of Rafter, Purling, Skylights etc. Installation of Columns, Beams, & Structural Segments at Site. Preparation of Daily Progress Report, Monitoring the progress, & Project Co ordination. Co-Ordination with the Clients for the Technical Clarification. Co- ordinate for the Preparation of Invoices. Additional Duties: In addition to above, I am also responsible to arrange Project Review Meetings and prepare Minutes of Meetings (MOMs). To ensure implementation of decisions taken in the meetings and give feed back to the Top Management. Achievements: Developed various formats for Integrated Management System (IMS) for System Improvement and is being implemented in DAS and giving good results. Executive Engineer Nov 2010 to Dec 2012 Company Profile: Leading powerhouse in electronics and electrical engineering Job Profile: Assembly & Utility section of plant Looking after preventive, predictive & breakdown maintenance activities. . Maintenance of plant as well as operations. Maintenance of different kinds of pumps (centrifugal & reciprocation) periodically. Refrigeration systems like Voltas chillers, AHUs, Air compressors Dryers Maintenance of various equipments like Cranes (5 to 400 Ton), Vacuum pumps, Boilers, Winding Machines, Air casters, Oil Filtration Machines, Voltas Forklift, Linde Forklift, Stackers, Scissor Lifters, Assembly Platforms, Formers, Ovens, Power & Pneumatic Tools like Copper cutting tool, Band saw etc. Modifications related to jobs & follow up with contractors. Clearance of Invoices. Involved in Maintenance of Boilers, Air Compressors, AHU,Oven,Winding Machines, Pumps, Refrigeration Systems like Vapor Absorption chiller Material and manpower planning activities. Preventive Maintenance Monitoring, Monthly PM Schedule and plant related activities. Co-ordination and execution of work to the satisfaction of client, Quick communication and remedial actions during Shutdown. Monitoring of all work activities and tool usage taking into consideration using safety norms by safety and accordingly directing personnel at works using Zero Accident Philosophy. Achievements: Due to timely Equipment Condition monitoring and taking remedial action prior to break-down which has given good results and frequent break-down of equipments was being reduced. Executive Engineer March 2009 to Oct 2010 Company Name: GMR Energy Limited Job Profile: Worked as Field Engineer for 6 months, after that worked as Control Room Engineer. Worked on LM6000PC G.E Gas Turbine operational features, start/stop logic sequences and its instrumentation. Experience on ABB ALSTOM V63 Steam turbine operation, start up modes, ramp rates, loading, Instrumentation and Control System. Hermitically Sealed Chillers, ISM, Control System, CCN, HMI operation. Planning and coordinating all the activities, prior to and during and after unit shut down. Assisting the shift charge engineer in technical issues and trouble shooting and carrying out Design change Request. Meeting the required production level in accordance with quality, safety, reliability and cost control. Implementation of Quality Management System (QMS) (ISO 9001:2000), Environmental Management System (EMS) (ISO14001) and Occupational Health and Safety Assessment Series (OHSAS 18001) all integrated into (ESHQ). Abstract Knowledge of:- GT LM6000PC and its auxiliaries Operation philosophy Cooling tower control & Operation Steam Turbine system and Heat Recovery Steam Generation Process. Circulating Water System. Operation of Chiller and Compressor system. DM plant and Fire Water Pump House operation Gas Conditioning Skid Operation philosophy Switchyard, synchronization of GT with grid Achievements: The above plant was shifted to Kakinada from Mangalore. I was Grossly involved in Entire winding up procedure and commissioning of the same at Kakinada. Engineer (Operation) Aug 2006 to Feb 2009 Company Name: Utility Powertech Limited Job Profile: Safe start up and normal shutdown of GT and ST as per normal operating procedures Safe start up and normal shut down of HRSG (heat recovery steam generator) and maintaining normal boiler parameters Involved in combustion and hot gas path inspection involved in checking and monitoring BOP systems Judicious monitoring of the operational data for preventive action Achievements: I was involved in the commissioning of RGPPL (earlier DABHOL power, ENRON) block#3 consisting of 2 230 MW GE Frame 9FA+ GT (Gas Turbines), And 1 GE D11 ST (Steam Turbine). I was looking after gas turbine and steam turbine commissioning from operation point of view. Following activities were performed during commissioning of GT and ST in Coordination with BHEL and GE Involved in most of the maintenance work from operation side Detailed scheme tracing of all the systems to inspect the availability of components as per given piping and instrumentation diagrams and design data. Perform Mark V interface checks with all the field components Flushing of lube oil system, seal oil system, cooling water system of GT (gas turbine) and ST (steam turbine). Conduct No load and load trial of various GT, ST and HRSG auxiliaries, like lube-oil pumps, seal oil pumps, BFP, CEP, CW pumps, AA fans, GT cooling and sealing fans. Perform Pre-start activities such as charging of lube oil system, seal oil system, hydraulic oil system, cooler lines, and H2 filling and power supply normalizations Preparation of BOILER HYDRO TEST of HRSG. Putting GT and ST on turning gear, and cranking, synchronization of GT and ST. Conduct Air tightness test of Generator, CO2 puff test. Fogging system & chiller coil system. Operating plant from central control room using Foxboro DCS, HMI and Mark-V Controls for smooth start-up, operation and shutdown of the plant. Issuing safety work permits and working on computerized maintenance management system (ANNURAKSHAN). Actively involved in commissioning and startup of Gas Turbine, steam Turbine and HRSGs. Planning & Production Engineer July 2005 to Aug 2006 Company Name: VautidShah Hard face Pvt. Ltd. Job Profile: Designing of Jigs & fixtures and Preparation of Process Plan for Projects Planning stage-wise inspection of entire manufacturing process. Submission of Invoices of Material to Purchase Department, Arranging Outsource work & vendor development. Planning of entire project & estimating delivery schedule. Planning for monthly load chart for all machines on shop floor. Dispatching orders as per planed schedule. Developing new vendors for pressing & rolling. Trainee Engineer Feb 2005 to July 2005 Company Name: India Tube Mill Ltd. Job Profile: Activities required in completion of Heat Exchangers, Commencement of Pressure Vessels till dispatch. Hydro testing as per client?s requirement. Curriculum Project: Project Title: ?Source Management of Welding Consumables and Plasma Cutting" Organization: Mazgaon Doc Ltd. Future Goals: Seeking a position in an Industry to utilize my skills and abilities in an Organisation that offers professional growth while being resourceful, innovative and flexible. ________________________________________________________________________________________