Ref. No. : CA - 27433 (Maintenance and Service - Mechanical with 13 years in Plastic Industry)

Gender
Male
Age
36 Years
Designation
Senior Engineer
Highest Education Level
Diploma
Current Gross Salary
INR 600000 /Annum
Expected Gross Salary
INR 800000 /Annum
Preferred Country
India
Preferred Location
Daman
Notice Period
30 Days
Education Details
Diploma In Plastic Technology From Ujjain Polytechnic, R.G.P.V Bhopal in 2005 With 66%

Post Diploma In Machine Maintenance From CIPET Ahmedabad, in 2006 With 70%

12th (P.C.M.) From M.P.Board with 64.6%

10th From M.P. Board with 63.6%
Skill Sets
I Can Handle All Types Of Problem Like Mechanical And Electrical.

MS- Office

 

Work Experience
13 Year(s)

 

Work Experience Details
Shift Engineer - Maintenance and Production
Since Dec 2007
Company Profile: Involved in manufacturing of thermoplastics injection molded articles for engineering products and house ware items.

Sr Maintenance Engineer
Jul 2006 to Nov 2007
Company Profile: Manufacturer of furniture and household products (chairs, tables, benches and buckets, basket, bins etc) Materials processed includes - HDPE, LDPE, PP, PP-R, LLDPE, PS, HIPS, ABS, Nylons, PC etc.

Job Profile:
Hard working, efficient in handling challenging work environment
Always try to learn new things and implement quickly.
To attained the all type of maintenance like as; Preventive maintenance, Predictive maintenance & Breakdown maintenance.
Planning & execution of corrective maintenance.
Material arrangement and Spare Parts inventory control.
To diagnose and analyses the Break-down of Machines.
Strong functional background in electrical/hydraulic controlled plastic molding machines, ancillary, equipment and utilities with electrical controls (Allen bradely, VIGNUN, B&R, Devansi, LNC5, LNC6, Hicom) in injection molding machines.

Project:-
Maintenance & trouble shooting of extrusion Blown film m/c.
Reconditioning of Servo Voltage Stabilizer.

Area of interest: Maintenance and servicing

Achievements-
Reduced the hydraulic oil contamination's by reducing leakages from machine and better oil maintenance with filtration unit (This contributed to less hydraulic related problem on machine.
Reduced the mould change over time by standardizing core pulling hydraulic piping/cooling water lines in the mould machine and electrical connection.
Dedicated towards work assigned with an eye always on goal.
Reduced the down time in ancillaries from 2% to 0.5% by upgrading / modifying the same.
Future Goals
Seeking a position to utilize my skills and abilities in the Industry that offers professional growth while being resourceful, innovative and flexible.

 

 

     

 

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com