Ref. No. : CA - 20641 - (Production - Moulding – with 14.7 years in Plastic Industry)

Education

Diploma in Polymer & Plastic Engg From Dr. Babasaheb Ambedkar Technological University in 2010

S.S.C From Sane Gurugi Vidyalaya, Mumbai Board in 2004

Work Experience

Production Engineer
Since Apr 2013
Company Profile: Manufacturer of plastics automotive molded components
Job Profile:
To Produced Automotive Speedometer plastic molding component. Check cycle time, manage raw material as per requirement. To control minimum rejection. Adjust all process machine parameter. Check total production, total rejection, and total down time. Fill up all production documents. setting the machine process parameter as per required. Also work mould assembling to machine or dismantling from machine. Mold setting for machine to its accurate position. Set the system parameter & control the rejection as well as solve the problem for Trouble-shooting.
As well as machine preventive maintenance per week. Mould assembly as well as mould preventive maintenance. The company supply material for automotive industries like Bajaj, Honda, Suzuki, Mayur Industries, And Manas Automotive etc also household application material supply for Prothom Industries Etc.

Production Supervisor 
Dec 2010 to Jan 2013
Company Profile: Manufacturer of assembly supply for Bajaj, Honda, And Suzuki. In that assembly we are used following component arrangement.
Wiring Harness.
Bulb (6W,12W)
Sealing Ring(Rubber or Foam type)
Silicon Oil.    
The company supply material for Garware Wall Ropes, Prince Pipe, Finolex Pipe Etc.
Job Profile: 
To operate injection molding machine, actually work to handle production activity as well as quality activity. Also handling the Man Power.
Production:-In production to setting the machine process parameter as per required. Also work mould assembling to machine Or dismantling from machine. Moulded setting for machine to its accurate position. Set the system parameter & control the rejection as well as solve the problem for Trouble-shooting.
QUALITY:-Check the production quantity & quality. Check the accuracy of production as well as to check particular sample for bench check testing. Check moulded parts Clips, Inserts are available Or Not. Then also the packing instruction given to operator for maintaining the quality substances. Maintain 5S &safety For every work.
Machine Handling:
HAITAIN :  200 TONS,250 TONS etc.
HAIXING :  200 TONS,250 TONS,etc.
MK PLASTIC M/C: 60 TONS,120 TONS,150 TONS,200 TONS.
ASIAN PLASTIC:  250 TONS .
WINDSOR:  130 TONES                                   Setting all process parameter to operate the machine.   
Assembly Area:
                        
In that activity to final molding component to check fit for assembly. we have produces assembly for automotive Two wheeler speedometer.
We are completed following assembly.
Access 125 Housing assembly.
BM Housing assembly.
D105 Housing assembly.
D106 Housing assembly.
SEEM Housing assembly.                                                                                        
All completed assembly check for pokayoke fitment &also quality check. Then finally all ok assembly quantity packed standard quantity for dispatch

Academic Project & Seminar:
Project Work Done:
Diploma
PROJECT: project on THermoforming Machine.
SEMINAR: presented seminar on Wax Additive In Plastic      Industry.

Inplant Training for Diploma:
SUPREME PETROCHEM LTD. NAGOTHANE, RAIGAD for one month.

Future Goals

Seeking a responsible and rewarding position in dynamic environment to learn and contribute in growth of the organization.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com